Objective:
To finish and submit report and blog to supervisor
Method:
- Finish up my final proposal report
Analysis:
This is the last week for finish my proposal report, Sir Akram which is mysupervisor ask me to submit the proposal report in his pigeon hole as he not at BMI. The last day to submit is on this friday.
conclusion;
As conclusion, on this friday (12.5.2016) i should be able to submit the report.
Tuesday, 10 May 2016
Week 13
Objective :
The final year presentation for FYP1
Analysis:
The presentation took place in the Gemilang Hall. The presentation started on 2,30 pm. I was assigned to two assessors from the FYP committee whom are lectures from Electrical Section. The assessors are Sir Dr. Syed Faiz and Madam Zurin.
For presentation,Alhamdulilah i was able to answers all the question that been given from the both assessors.
Conclusion:
Thought the presentation end well, I still need to finish up my and correct my proposal report.
The final year presentation for FYP1
Analysis:
The presentation took place in the Gemilang Hall. The presentation started on 2,30 pm. I was assigned to two assessors from the FYP committee whom are lectures from Electrical Section. The assessors are Sir Dr. Syed Faiz and Madam Zurin.
For presentation,Alhamdulilah i was able to answers all the question that been given from the both assessors.
Conclusion:
Thought the presentation end well, I still need to finish up my and correct my proposal report.
On the day of presentation
Week 12
Objective :
- Make final preparation for slide presentation
Method:
- Update blog
-Update slide presentation and also proposal
Result ;
-Almost finish 90% for project proposal
- 100% finish for slide presentation
Conclusion:
As a conclusion, i have finish my slide presentation and get ready for fyp 1 presentation on next week.
- Make final preparation for slide presentation
Method:
- Update blog
-Update slide presentation and also proposal
Result ;
-Almost finish 90% for project proposal
- 100% finish for slide presentation
Conclusion:
As a conclusion, i have finish my slide presentation and get ready for fyp 1 presentation on next week.
Week 11
objective:
- To list the price for all component and instruments for this project
Method :
- list all the component that need
-survey the price on market
Result:
Conclusion:
After make some research and survey about the component and cost needed for this project, its maybe cost about around Rm700.00. Its too expensive for me but i will claim it with Mara later .
- To list the price for all component and instruments for this project
Method :
- list all the component that need
-survey the price on market
Result:
Conclusion:
After make some research and survey about the component and cost needed for this project, its maybe cost about around Rm700.00. Its too expensive for me but i will claim it with Mara later .
Week 10
Objective :
-To make slide presentation
Method :
- Search some information about this project
- Make slide presentation by using power point
Result :
conclusion:
- as a conclusion, i have started doing my slide for presentation by using power point.
-To make slide presentation
Method :
- Search some information about this project
- Make slide presentation by using power point
Result :
conclusion:
- as a conclusion, i have started doing my slide for presentation by using power point.
Week 9
Objective
- Identify the system that been use in this project
Method
- After done some research, i manage create the block diagram and flow chart to shown the progress of the system in this project.
Below is the block diagram and flow chart:
(a) Block Diagram
(b) flow chart
(c)Flow Chart for occupancy sensor
(d)Flow Chart for daylight sensor
conclusion:
As conclusion, I successfully can design my project to get more knowledge by do more research and come out with this block diagram and flow chart.
Subscribe to: