Tuesday, 29 November 2016

Week 2 (Fyp 2)

Activity:

- To updates latest project with my supervisor for final year project Fyp 2.

Objective:
 -Update latest progress for FYP 2

Content:

- I met my supervisor Sir Akram to discussed about the plan for my Final Year Project 2. He gives me some advise to manage time and also work as group for doing my FYP with others friends so I don't be too stress. I also discuss about the component and project design that i have to use for my project and suitable software need to use to make the project. He also request me to change my component for my project as i change the software by using labview in fyp 1 to arduino in fyp 2.


Result:

- This are the list of component that i will use for my project :

1. Arduino Uno
2. Semi-Transparent Photovoltaic Module
3. Water Tank
4. Valve 12 Volts
5. Water Pump 12 volt
6. Copper Rode
7. Dimmable Led 12 volt
8. Battery 12 volt

-Software

1. Arduino Software

Conclusion:

 As a conclusion, i have meet my supervisor to manage the meet time with him and also i have get a permission from my supervisor about the idea to finalize the new component and design my project that i need to do for my Final Year project 2.

Week 1 (Fyp 2)



This is calendar of schedules of Final Year Project 2 ( S2'2016). this schedules can guide me to finish my project on time. 



UNIVERSITI KUALA LUMPUR  BRITISH MALAYSIAN INSTITUTE



Final Year Project Calendar
S2 2016


Week
FYP 1
WPB 49804
FYP Diploma
WPD 39806
FYP 2
WPB 49906
2
FYP Briefing#1

FYP implementation and   requirements:
- Title registration
- FYP Handbook
- FYP Logbook

 (Wednesday – 2.00 p.m)
FYP Briefing#1

FYP implementation and   requirements:
- Title registration
- FYP Handbook
- FYP Logbook

 (Wednesday – 3.00 p.m)


3


FYP Briefing#1

- Project 
  Development
- Progress Report (Log   
  Book/ Blog)

(Wednesday – 3.00 p.m)

4
FYP Title
Registration
Due: End of W4

FYP Title
Registration
Due: End of W4

8
FYP Briefing#2 / FYP Proposal Writing Workshop

Proposal Report

 (Wednesday – 3.00 p.m)



9

FYP Briefing #2

- Report writing

 (Wednesday – 3.00 p.m)
FYP Briefing #2/ Thesis Writing Workshop
- Report writing

 (Wednesday – 3.00 p.m)

10
FYP Briefing #3
- Proposal 
  Presentation
- FYP submission

 (Wednesday – 3.00 p.m)



11

FYP Briefing #3  
- Project Demo
  Preparation
- Final report
  compilation

(Wednesday – 3.00 p.m)

FYP Briefing #3  
- Project Demo
  Preparation
- Final report
  compilation

(Wednesday – 3.00 p.m)

12
Presentation Day

Tentative: (Wednesday – 3.00~5.00p.m)



13
Submission of
Project Progress Report (Log Book/ Blog
Complete Project Proposal Report

FYP 2
Course Pre-registration  for S1’2017
Industry Day
 Project/Poster           
 Presentation
-           Top 20 selection


Tentative:
 (Wednesday –2.00pm to 5.00pm)

Industry Day
 Project/Poster           
 Presentation
-           Top 20 selection


 Tentative
(Wednesday – 9.00am to 1.00pm)

14

Top 20 Competition

FYP Submission
 Progress Report    
 (Blog/Logbook)
 Draft  Final Report

Due: End of W14

Top 20 Competition

FYP Submission
 Progress Report    
 (Blog/Logbook)
 Draft  Final Report

Due: End of W14

16

Return of the corrected draft copy of the final report to students for correction

Return of the corrected draft copy of the final report to students for correction
17

Submission of
- Final Report (hard copy)
  to Resource Centre

Submission  of
Final Report/Thesis (hard copy) to Resource Centre